KONZERNSEITENKonzernportalChilechuan EnergieQingcheng KI-RechenzentrumChilechuan MilchChilechuan TourismusLieferketten-NetzwerkChilechuan Power GroupForschungsinstitut für ElektroausrüstungChilechuan HandelsgruppeChilechuan BergbaugruppeChilechuan ChemiegruppeKonzernportalwww.clc-group.cnChilechuan Energieenergy.clc-group.cnQingcheng KI-RechenzentrumAktuellaicloud.clc-group.cnChilechuan Milchdairy.clc-group.cnChilechuan Tourismustravel.clc-group.cnLieferketten-Netzwerkscm.clc-group.cnChilechuan Power Grouppower.clc-group.cnForschungsinstitut für Elektroausrüstungrnd.clc-group.cnChilechuan Handelsgruppetrade.clc-group.cnChilechuan Bergbaugruppemining.clc-group.cnChilechuan Chemiegruppechem.clc-group.cnaicloud.qyjt-demo.reiy.cn · 11 SeitenAdmin-Anmeldung
SYSTEM ONLINE NODE: HOHHOT-IDC-01 PUE 1.12 LOAD 78.4% GCJ-02 40.8122°N / 111.6705°E 99.995% uptime · last 365 days
NATIONAL GREEN DATA CENTER · Hohhot

Rechenleistung aus eigener Fertigung
ein öko-strombetriebenes KI-Fundament

18.600 Racks in Betrieb, PUE 1,12, 63 % der Rechenleistung aus eigener Fertigung. Direkt an Windkraft in Ulanqab und Solarstrom in Ordos angebunden — Training und Inferenz für 37 Kunden aus Verwaltung und Wirtschaft.

18,600Racks in service
1.12Annual average PUE
63%Share of domestic computing power
420MWh of co-located storage
99.995%Annual availability
37government and enterprise clients

Service assurance

SLA written into the contract
≤ 15 minIncident ticket response
7×24On-site operations and inspection
MLPS level 3National crypto SM2/SM3/SM4
Live rack statusHALL A / B / CLIVE
Data hallsRacksLoadTemperatureStatus
Zone A · training cluster6,240 86%22.4℃Normal
Zone B · inference cluster5,180 74%21.8℃Normal
Zone C · domestic hardware4,020 91%23.6℃High load
Zone D · government zone2,140 52%21.2℃Normal
Zone E · cold standby1,020 12%20.6℃Pending
Green power share 82.6%Source: metric platform · refreshed every 30 s

Computing service catalogue

SERVICE CATALOG
01

GPU training cluster

Supports thousand-card parallel training, mixing domestic and mainstream cards, billed by the hour.

A100 cluster · 512 cards
02

Inference and deployment

Model hosting with elastic scaling, offered both as a standard API and as on-premises deployment.

6,000+ QPS · latency <80 ms
03

Storage and data

120 PB of distributed storage with hot and cold tiers, supporting national cryptography and cross-region disaster recovery.

120 PB · three replicas
04

Compliance and security

MLPS level 3 data halls, national cryptography, access auditing and geofencing meet government and enterprise requirements.

SM2/SM3/SM4

Site interconnection topology

AMap GIS · GCJ-02
Group HQ · Hohhot40.84°N
111.75°E
HQ / control hub
Ulanqab Wind Base40.99°N
113.13°E
2.31 GW
Ordos Solar Base39.61°N
109.78°E
1.95 GW
Qingcheng AI Computing Centre40.81°N
111.67°E
18,600 racks / PUE 1.12
Xilin Gol Grassland Farm43.93°N
116.09°E
620,000 t/yr raw milk
Hulunbuir Tourism Camp49.21°N
119.74°E
8 routes

Operations notices

Synced with OA approval status
2026-09-24Qingcheng AI Computing supplies domestic computing power to 37 government and enterprise clientsKundenbeispiel · KI-Vorprüfung 87

Request computing resources

Submitted requests enter the OA approval flow

Resource request registration

Flow: requester → department head → AI computing division → finance shared service centre (AI pre-review averages 38 s)
Compliance baselineMLPS 2.0 level 3
MLPS complianceLevel 3 · filed
Encryption algorithmSM2 / SM3 / SM4
Access controlSSO + MFA + device fingerprint
GeofencingDomestic access policy
Key figuresOn-premises deployment
Audit trailFull volume · retained 180 days